A report will be generated after each inspection and can include the following:
- Ensure that the material being installed meets the site-specific specifications including all special requirements
- Ensure that the material being installed meets the manufacturer’s installation instructions as well as RCABC requirements (where applicable)
- The general area of the building or specific roof section where the work was performed
- Weather conditions at the time of the inspection
- Roofing contractor crew size
- Contractors compliance with the site-specific specifications
- Note any deficiencies discovered and provide direction to correct them if required
- Note if any deficiencies from previous day’s work have been corrected
- Any other information determined to be relevant by the consultant